(b) Pneumatic system elements must be burst pressure tested to 3.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.
(c) An analysis, or a combination of analysis and test, may be substituted for any test required by paragraph (a) or (b) of this section if the Administrator finds it equivalent to the required test.
[Amdt. 25–41, 42 FR 36971, July 18, 1977]
NEXT: Sec. 25.1439 - Protective breathing equipment.
PREVIOUS: Sec. 25.1435 - Hydraulic systems.