(b) The removal and relocation of an airport hangar that is an airport hazard (as described in §151.39(b)) is eligible, if the reerected hangar will be substantially identical to the disassembled one.
(c) Whenever a hangar must be relocated (either for clearance of the site for other airport development or to remove a hazard) and the existing structure is to be relocated with or without disassembly, the cost of the relocation is an eligible item of project costs, including costs incidental to the relocation such as necessary footings and floors. However, if the existing structure is to be demolished and a new hangar is to be built, only the cost of demolishing the existing hangar is an eligible item.
[Doc. No. 1329, 27 FR 12357, Dec. 13, 1962, as amended by Amdt. 151–22, 33 FR 8267, June 4, 1968]