(1) Adequate plans and specifications showing the nature and extent of the construction work to be performed under that force account;
(2) A schedule of the proposed construction and of the construction equipment that will be available for the project;
(3) Assurance that adequate labor, material, equipment, engineering personnel, as well as supervisory and inspection personnel as required by §151.45(f), will be provided; and
(4) A detailed estimate of the cost of the work, broken down for each class of costs involved, such as labor, materials, rental of equipment, and other pertinent items of cost.
(b) [Reserved]
[Doc. No. 1329, 27 FR 12351, Dec. 13, 1962, as amended by Amdt. 151–17, 31 FR 16525, Dec. 28, 1966; Amdt. 151–31, 34 FR 4885, Mar. 6, 1969]